ARG
industrial, storage, craft
direct mandate
earth from the excavation and terracota sourced from the demolition process will be integrated in the raw earth bricks composing the facade. sands and gravels for the concrete will be sourced on site, allowing production, transport and movement of materials to be reduced to a minimum.
2019 – 202x, geneva