EPURA

EPU

Extension of the water department building

Competition

The proposal was to continue the typological logic of the existing building. But, to ensure ecological continuity on the ground (small mammals, insects and other small inhabitants of the earth), the extension was planned on posts, leaving the ground completely free. Not compact enough, they said. Not sure that an artificial crater for concrete foundations would be more ecological. But the discussion is worthwhile.

2024, Lausanne

cabinet médical avenue de GEORGETTE Lausanne

GRG

Design for care

Medical facilities have traditionnally been visually sterile and consciously neutral.

This refurbishment of a medical practice on a very tight budget allowed (or forced?) us to negotiate with the existing structure and the technical modifications of the 1970s.

Suspended ceilings and plaster partitions have been removed, exposing the organs, veins and bones of the building. A new skin of sprayed plaster covers them like a veil, producing an inspiring surface to look at, while the practicioner is examining your body.

In the access corridor, mirrors mounted on the doors create an fascinating game of depths and counter perspectives, challenging the very classical layout and giving the patient a time to reflect before entering the medical practice itself.

2015, Lausanne