LUL
housing
2021 – 2027, Geneva [GE]
The farm shed is being dismantled piece by piece. The timber is inventoried and stored. After adaptation and machining, it will be entirely reinstated in the construction of the new building. The sandstone column bases will be used as spolia for the new plinth. The concrete floor slab will be cut into pieces to be used for landscaping.