Lullier

LUL

housing

2021 – 2027, Geneva [GE]

The farm shed is being dismantled piece by piece. The timber is inventoried and stored. After adaptation and machining, it will be entirely reinstated in the construction of the new building. The sandstone column bases will be used as spolia for the new plinth. The concrete floor slab will be cut into pieces to be used for landscaping.

ARG

ARG

industrial, storage, craft

direct mandate

earth from the excavation and terracota sourced from the demolition process will be integrated in the raw earth bricks composing the facade. sands and gravels for the concrete will be sourced on site, allowing production, transport and movement of materials to be reduced to a minimum.

2019 – 202x, geneva